Never Stop Building
Hazel McCallion Line LRT

Hazel McCallion Line LRT

Description

The Hazel McCallion LRT (formerly Hurontario LRT) consists of an 18 km line from the Port Credit GO station in Mississauga to the Brampton Gateway Terminal, providing an alternate transport mode to driving and improving connectivity within and between the two municipalities. The project includes 18 surface stops and one below-grade station, a fleet of 28 light rail vehicles and an operations, maintenance and storage facility. The HMLRT will also be fully integrated with municipal transit systems including connections to GO Transit lines and transit ways. The project will be one of the region’s most important transit projects due to its visibility and focus on connecting two of the largest and fastest- growing municipalities in the Province.

Scope

Amico is part of Mobilinx, the consortium awarded the $4.6 B DBFMO contract for the HMLRT. Amico is a member in each of the consortium’s Applicant Lead, Design Build Joint Venture and the Construction Joint Venture.

Hazel McCallion Line LRT
  • 18 KM LINE FROM MISSISSAUGA TO BRAMPTON, ON
  • $1.4 B
  • DESIGN-BUILD-FINANCE- MAINTAIN-OPERATE
  • METROLINX INFRASTRUCTURE ONTARIO

As founder and President, Mr. Amicone directs, co-ordinates, and oversees a select team of dedicated professionals to ensure overall target objectives are attained. Ensuring a seamless delivery to the client, Mr. Amicone is responsible for the overall management of the entire contract, leading and maintaining internal programmes and workcycles as well as dealing at the senior level with the owner, local Authorities and all third-party stakeholders.