Gordie Howe Int’l Bridge
Description
The Gordie Howe International Bridge is a major new international crossing point that spans the Detroit river between Windsor, Ontario and Detroit, Michigan. It will provide a more direct roadway link between Michigan’s I-75 and the Rt. Hon. Herb Gray Parkway/401 corridor at Canada’s premier trade gateway.
Scope
- Installation of 850,000 lineal metres of wick drains
- Construction of perimeter 4.25 km access road
- Sewers, watermains, sanitary forcemain, retention ponds, creek drain alignment, soil remediation, etc
- Utility relocation and underground and overhead electrical infrastructure
- Construction of on-ramp deck (Canadian side)
Key Features
- Environmental Management (working next to river, SAR mgmt, etc.)
- Stakeholder Relations (all levels of government, adjacent business, etc.)
- Site Coordination/Health & Safety (many contractors active on site)
- Site Security Measures (internation crossing location)

- Various construction phases on 53 hectares
- 25 M combined projects
- Gen./Site Works Contractor
- Windsor-Detroit Bridge Authority Bridging North America